Line 3 (Changchun Rail Transit)

Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006[1] and 31 December 2021. This line is currently 34.3 km long with 34 stations (32 in operation, Furong Bridge Station and Xi'an Bridge Station are under construction).

Line 3
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
TerminiPuppet Regime Palace Museum
Changchun Movie Wonderland
Stations34 (32 in operation, 2 under construction)
Service
TypeLight Rail
SystemChangchun Rail Transit
Services2
Operator(s)Changchun Rail Transit Corporation
History
Opened30 October 2002 (2002-10-30)
Technical
Line length34.3 km (21.31 mi)
Number of tracks2
CharacterUnderground, at-grade and elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)

Opening timeline

SegmentCommencementLengthStation(s)Name
Changchun Railway Station — Weiguang Street 30 October 2002 14.9 km (9.26 mi) 17 Phase 1
Weiguang Street — Changchun Movie Wonderland 26 December 2006 17.0 km (10.56 mi) 16 Phase 2
Changchun Railway Station — Puppet Regime Palace Museum 31 December 2021 2.4 km (1.49 mi) 2 East extension

Future Development

A Southern extension from Changchun Movie Wonderland to No.59 Middle School is under planning.

Service routes

  • Puppet Regime Palace Museum — Changchun Movie Wonderland
  • Puppet Regime Palace Museum — Shiji Square

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
●● Puppet Regime Palace Museum 伪满皇宫  4  Kuancheng
●● Dongguangchang 东广场
●● Changchun Railway Station 长春站  CJ ~ JH   CB ~ BA  CCT
 1 
0.00 0.00
-- Furong Bridge (under construction) 芙蓉桥 0.55 0.55
-- Xi'an Bridge (under construction) 西安桥 0.80 2.55 Luyuan / Chaoyang
●● Nanchang Road 南昌路 0.65 3.20
●● Chaoyang Bridge 朝阳桥 0.65 3.85
●● Jiefang Overpass 解放桥  2  1.00 4.85
●● Huxi Bridge 湖西桥 0.90 5.75
●● Kuanping Bridge 宽平桥 Trams 54 and 55 0.95 6.70
●● Fusong Road 抚松路 1.05 7.75
●● Mengjiatun 孟家屯 CET  7  0.60 8.35 Chaoyang
at-grade crossing
●● Huguang Road 湖光路 0.85 9.20
●● Diantai Street 电台街  5  1.60 10.80
●● Qianjinxi 前进西 0.70 11.50
●● Qianjin Street 前进大街 0.50 12.00
at-grade crossing
●● Weiming Street 卫明街 0.75 12.75
●● Weiguang Street 卫光街 1.05 13.80
at-grade crossing
●● Weixing Square 卫星广场  1  0.65 14.45 Chaoyang / Nanguan
●● Yatai Overpass 亚泰立交桥 1.25 15.70 Nanguan
●● Yitong River 伊通河 0.85 16.55
●● Vocational Institute of Technology 职业学院  4  1.35 17.90 Erdao
●● Jilin TV & Radio Center 吉林广电 1.05 18.95
●● Conference & Exhibition Center 会展中心 0.90 19.85
●● Shiji Square 世纪广场 1.10 20.95
● Jinxin Street 金鑫街 1.55 22.50 Nanguan
● Boshuo Road 博硕路 0.85 23.35
● Jinhe Street 金河街 1.20 24.55
● Agricultural Expo Garden 农博园 0.95 25.50
● Jingyuetan National Park 净月潭公园 1.30 26.80
● Zishan Road 紫杉路 1.50 28.30
● Baoxiang Street 宝相街 1.00 29.30
● Ski Resort 滑雪场 1.25 30.55
at-grade crossing
● Changchun Movie Wonderland 长影世纪城  6  0.55 31.10

See also

Notes

    References

    1. 12月26日长春轻轨二期将运行 可能采用阶梯票价. 搜狐新闻 (in Chinese). Archived from the original on 2014-02-02. Retrieved 2012-10-04.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.