Line 1 (Chengdu Metro)

Line 1 of the Chengdu Metro (Chinese: 成都地铁1号线; pinyin: Chéngdū Dìtiě Yī Hào Xiàn) is the first line to enter revenue service on the metro network in Chengdu, Sichuan, China. The line started construction in 2005,[2] and entered service on September 27, 2010.[3] On July 25, 2015, an extension towards Guangdu was opened for service.

Line 1
1
Platform of Luomashi station
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
TerminiWeijianian
Science City
Wugensong
Stations35
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Daily ridership1.0781 million (2018 Peak)[1]
History
Opened27 September 2010 (2010-09-27)
Technical
Line length39.9 km (24.79 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead lines, 1500 V DC
Route map

Weijianian
Honghuayan depot
Shengxian Lake
Chengdu
Baocheng, Chengkun railways
North Railway Station 7
( Outer Loop – Inner Loop )
Renmin Road North 6
( Wangcongci – Lanjiagou )
Wenshu Monastery
Luomashi 4
( Wansheng – Xihe )
Tianfu Square 2
( Xipu – Longquanyi )
connects 2
Jinjiang Hotel
Huaxiba
Sichuan Gymnasium 3
( Shuangliu West Station – Chengdu Medical College )
Nijiaqiao 8
( Lianhua – Shilidian )
Tongzilin
Chengdu South
South Railway Station 7 18
( Inner Loop – Outer Loop )
Hi-Tech Zone
Financial City
( Huangtianba – Financial City East )
Incubation Park 9 18
Jincheng Plaza
Century City 18
3rd Tianfu Street
5th Tianfu Street
Huafu Avenue
Sihe
right: branch section
Guangdu
Hongxing depot
Wugensong
Huayang
Haichang Road 18
Guangfu
Hongshi Park
Luhu Lake
Wuhan Road
Tianfu Park
( Lanjiagou – Wangcongci )
Western China Int'l Expo City 6 18
Guangzhou Road
Xinglong Lake
Science City

Line 1 is a crosstown north-south trunk route, stretching from Weijianian in the north of town to Science City in southern Chengdu. This line serves both the northern and the southern railway stations.

Much of Line 18, the first phase of which opened in 2020, runs adjacent to Line 1, however it is an express line which skips some of the stops Line 1 serves.

Opening timeline

SegmentCommencementLengthStation(s)Name
Shengxian Lake — Century City 27 September 2010 18.5 km (11.50 mi) 16 Phase 1
Jincheng Plaza 8 June 2013 Infill station 1
Century City — Guangdu 25 July 2015 5.4 km (3.36 mi) 5 Phase 2
Shengxian Lake — Weijianian 18 March 2018 1.5 km (0.93 mi) 1 Phase 3
Sihe — Science City 14.0 km (8.70 mi) 11
Guangdu — Wugensong 1.4 km (0.87 mi) 1

Stations

Service
routes
Station

№

Station name Connections Distance
km
Location
English Chinese
●● 01 01 Weijianian 韦家碾 - 0 Jinniu
●● 01 02 Shengxian Lake 升仙湖 1.514 1.514 Chenghua
●● 01 03 North Railway Station 火车北站 7  CG  CDW Chengdu BRT 1.593 3.107 Jinniu
●● 01 04 Renmin Road North 人民北路 6 1.180 4.287
●● 01 05 Wenshu Monastery 文殊院 1.351 5.638 Qingyang
●● 01 06 Luomashi 骡马市 4 0.884 6.522
●● 01 07 Tianfu Square 天府广场 2 1.018 7.540
●● 01 08 Jinjiang Hotel 锦江宾馆 0.833 8.373 Jinjiang
●● 01 09 Huaxiba 华西坝 0.779 9.152 Wuhou
●● 01 10 Sichuan Gymnasium 省体育馆 3 1.058 10.210
●● 01 11 Nijiaqiao 倪家桥 8 0.961 11.171
●● 01 12 Tongzilin 桐梓林 1.052 12.223
●● 01 13 South Railway Station 火车南站 7 18 CNW 1.113 13.336
●● 01 14 Hi-Tech Zone 高新 1.307 14.643
●● 01 15 Financial City 金融城 1.296 15.939
●● 01 16 Incubation Park 孵化园 9 18 0.826 16.765
●● 01 17 Jincheng Plaza 锦城广场 18 0.85 17.615
●● 01 18 Century City 世纪城 18 1.452 19.067
●● 01 19 3rd Tianfu Street 天府三街 0.965 20.032
●● 01 20 5th Tianfu Street 天府五街 1.011 21.043
●● 01 21 Huafu Avenue 华府大道 1.261 22.304 Shuangliu
●● 01 22 Sihe 四河 1.099 23.403
●| 01 23 Huayang 华阳 1.413 24.816
●| 01 24 Haichang Road 海昌路 18 1.178 25.994
●| 01 25 Guangfu 广福 1.565 27.559
●| 01 26 Hongshi Park 红石公园 1.611 29.170
●| 01 27 Luhu Lake 麓湖 1.090 30.260
●| 01 28 Wuhan Road 武汉路 1.347 31.607
●| 01 29 Tianfu Park 天府公园 1.169 32.776
●| 01 30 Western China Int'l Expo City 西博城 6 18 0.915 33.691
●| 01 31 Guangzhou Road 广州路 0.696 34.387
●| 01 32 Xinglong Lake 兴隆湖 1.475 35.862
●| 01 33 Science City 科学城 1.612 37.474
● 01 Y1 Guangdu 广都 1.033 24.436 Shuangliu
● 01 Y2 Wugensong 五根松 1.396 25.832

Future extension

It was proposed in Phase 3 that line 1 should be extended to Laijiadian, or even Dafeng. However this plan is stalled due to military zone in the affected area.

See also

References

  1. 戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
  2. "UrbanRail.Net > Asia > China > Chengdu Metro".
  3. "国内首条路地共建共管地铁成都地铁一号线开通试运营". 中华人民共和国铁道部. 2010-09-29. Retrieved 2010-09-29.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.